Ian and Paul Harrison also had to go over the pitch adding more seed to the areas where it had not taken or the seed had been eaten by the birds.
Mick and Ian have also been removing the concrete blocks which had held the old goalposts in place and preparing the holes required for the new ones. Breaking out the old concrete is a time consuming job and particularly at the South Stand where there are power cables and water pipes in the proximity and needing to be avoided.