Above - the cherry picker brought on site by Tyco is seen reversing from Cut Throat Lane down pass toilets to re-fix cables that have been brought down and repaired re-fixing.
There was a need to repair one of the cameras on the floodlights which had been affected in the wind and re-adjusting into it's correct position
Scroll down to see more -
They needed to cleared of all debris built up recently to allow water to flow away. The front of the Dublin Suite wh is particularly at risk of flooding when there is heavy rain
below - CAT were also on site to re-attach items on the floodlights and that had come loose recently