Much of it appears to be cosmetic however most of the jobs being completed have appeared on maintenance reports needing to be completed
iWith the summer weather being kind we have concentrated on the exteranl work. Now the jobs internally will start being planned.
See the photos below
The Gnome is from HMS Lawn and they now have their own facebook site - click here if you would like to follow their trips around the country during the next few months -
www.facebook.com/CUFC-Gnomes-on-road-283592822417574/
Alan is painting the Habbin Turnstiles
White Masonry paint is being used on highlighted areas within the safety report to protect the brickwork from weathering.
Toilets door frame have been repaired in the Ladies Toilets in the Main Stand. Job inside are now starting to be looked at, planned and costed.
Hazard lines painted by the NRE safety gate by Peter
Mick is locating the sprinklers before work commencing on the pitch to proevent hitting them
Mick Radford needing a lift as he tired after a late night out watching Get Back in their final concert.
South Stand work is being done this week and area needs to be taped off. This will repair the reservoir following a building inspection
The Abbey Arms is being repaired following it being hit by a vehicle during the summer. This will mean the building is weather proof again and usable
The rails behind the Habbin have been painted following a new bridge having to be erected and further rails
being added. Although it may not not look urgent it is another preventative job and one highlighted as being required. The bridges have taken almost all summer to do the work.
Lawn mowers beng repaired following a breakdown
Final picture is the work being done on the area behind the goal at the South Stand to help the grass there