Alan Burge has been painting the handrails in the Main Stand Amber
Les Weston is painting the doors on the generator building behind the NRE
Mick Radford has been painting a window frame in the compound.
Mick Brown is painting the track side metal work in front of the Habbin and NRE terraces
Match day tickets arrive at the ground today as did the rope for going around the pitch. However, how many people does it take to unknot the rope before getting it laid out?