Alan has been working on the accessible stand today and the second coat will be completed tomorrow. We weren't going to paint the shelter but once everywhere else was done it stood out and needed to be changed
Les has been painting the bridge, however it is a real sun trap and he can only work on it for short periods. This afternoon he started to prep the accessible stand area at end of Main Stand by washing down and preparing it for painting.
Emma has been painting and finishing the doors shown in the photos below. Here again the ladies toilet door was a real bonus. It had been planned for doing in future and brought forward
The whole ground is becoming a far brighter place nowadays
Other work being done taody was -
Clearing some more Ivy in the Habbin area
Starting to wash and clean both set of dugouts for for painting
Mick R came in for n extra day to complete the cable re-route on the old changing rooms and completed this
Wendy has been all over the place cleaning everything within the dressing room areas, dug out and player entrance